PreFab

“Ready-Made for Productivity- Prefabrication”

“Ready-Made for Productivity- Prefabrication”

Aldridge’s VDC team is made up of modeling staff skilled in CAD and BIM. They work with the project and prefab teams to model and design the projects, creating design and spool drawings to assist with the prefab process and installation in the field. Aldridge was recently promoted in an article inside ECMAG written by Susan DeGrane. There she writes about our prefabrication process and how it is such an asset to our work. 

Mental Wellness Week Recap

Mental Wellness Week Recap

December 5-9, 2022 is a week dedicated to providing Aldridge employees and their families with resources and means to achieve mental wellness. Throughout the week, employees were welcomed to join ‘Toolbox Talks’ to increase their knowledge and awareness of their mental state. These talks included daily check-ins, statistics, facts, do’s and don'ts, and tips to deal with mental wellness. 

The Pivotal Role of BIM in the Construction Industry

The Pivotal Role of BIM in the Construction Industry

Aldridge prides itself on leveraging state-of-the-art technologies to provide the highest quality project delivery in the smartest, safest manner possible. As the industry continues to increase the utilization of Building Information Modeling (BIM) and other new programs, Aldridge has elevated its focus on collaboration among our PreFabrication Department, BIM professionals, and project teams to drive planning and execution, and yield value-engineered outputs.