EPC Greenfield Transmission Line Rebuild - Michigan
Power | Distribution | Transmission | Design-Build | Michigan
Project Summary
Aldridge is the prime contractor on this design-build transmission line rebuild located through St. Joseph and Cass Counties, Michigan, and Elkhart County, Indiana.
Aldridge will oversee the design and installation of 8 miles of 138kV rebuild, 9 miles of 138kV greenfield, 12 miles of demolition, and miscellaneous substation work.
Outage schedule coordination will be critical to keep this project on track. Throughout this project, the Aldridge team will continue to assist the utility as they refine and revise the outage schedules based on maintaining grid reliability, weather or access constraints, and mitigation needs.