West Lake Corridor  - Indiana 

Transportation | Transit & Rail | Mass Transit | OCS | Indiana


Project Summary

Aldridge was awarded the entire electrical package on the 9 mile extension. The major components include the station electrical work, overhead catenary and traction power system, the wayside communication system and wayside train control system including the positive train control (PTC).


Gallery

Previous
Previous

Southwest Light Rail Extension - Minnesota

Next
Next

Dan Ryan Track Renewal - Illinois