West Lake Corridor - Indiana
Transportation | Transit & Rail | Mass Transit | OCS | Indiana
Project Summary
Aldridge was awarded the entire electrical package on the 9 mile extension. The major components include the station electrical work, overhead catenary and traction power system, the wayside communication system and wayside train control system including the positive train control (PTC).