The scope of this job included the installation of 188 drilled shaft foundations up to a size of 13 feet diameter by 49 feet deep. The majority of the foundations were drilled without an outage and beneath live 345 kV lines using low clearance drill rigs. Approximately 1,500 cubic yards of limestone rock was drilled on this project.