Intermodal Facility Modernization - California
Transportation | Intermodal | California
Project Summary
Aldridge completed an upgrade project at the Los Angeles Transportation Center. The project included the installation of new tracks, buildings, water system, storm drain system, and storm trap. Also included were a communications system, electrical system, compressed air system, job site paving, and new bridge entrance. The scope of work performed by the team included 21,000 LF of duct bank, 114 hand holes, 248,000 LF cable pulling, eight transformer, 12 sectional enclosures, two pad-mounted
switchgear and a substation. Crews performed temp power, communications, and electrical work for the canopy, waste water treatment plant, crane maintenance pad, and fueling system.