GCMW

Aldridge drilled and poured concrete for 756 foundations and 12 direct embeds for a 110-mile transmission line. Over 20,000 wood mats for access in wetland areas were continuously moved throughout the duration of the project. Over 40,000 cubic yards of concrete was poured and 1,515 cubic feet of rock was drilled.